Digital inspection reports, hour-based preventive maintenance, and project-wise tracking — all in one app. Built for Indian infrastructure contractors managing transit mixers, pavers, cranes, and batching plants across highway, metro, and bridge projects.
Infrastructure equipment runs across multiple project sites. Breakdowns delay milestones. Liquidated damages pile up. NHAI audits create panic. HVI solves all of this.
Paver breaks down during concrete pour. 200 cubic meters of concrete wasted. ₹15 lakh loss. Milestone missed by 3 days. Liquidated damages from NHAI. Sound familiar?
You have equipment spread across 8 highway packages. No idea which transit mixer is where. Which crane is idle. Which batching plant needs service. Just chaos.
Sensor paver was due for 500-hr service. Nobody tracked it. Now hydraulic pump failed. ₹25 lakh repair. Equipment out for 20 days. Project schedule blown.
NHAI quality audit next week. Equipment calibration records missing. Batching plant test certificates scattered. Crane fitness expired. Hours wasted finding documents.
Equipment moves between projects constantly. Which excavator is at which site today? When did it move? What condition was it in? No records. Just phone calls.
Which project is consuming most maintenance budget? Which equipment type is most expensive? No data. No project-wise cost reports. Just guesswork billing.
HVI digitizes your entire equipment management process. Daily inspections, hour-based PM, project-wise tracking, and audit-ready reports — all from one mobile app that works offline at remote highway and metro construction sites.
Operator completes digital pre-start checklist with photos. Issues flagged instantly. Work order created automatically if needed.
Set PM schedules by running hours. HVI tracks hours and reminds you before service is due. Never miss critical equipment service.
Assign equipment to projects. Track utilization, costs, and maintenance per project. Transfer equipment with complete history.
Real-time dashboards. Equipment availability, project costs, utilization reports. Export to Excel for audits and billing.
Not a generic software. HVI is built for Indian infrastructure contractors — with features that solve your specific problems on highway, metro, bridge, and tunnel projects.
Every operator completes digital inspection before starting work. Photo evidence for every check. Hour meter reading captured. Issues flagged instantly — work order created if needed.
Infrastructure equipment runs 10-16 hours daily during peak construction. Calendar-based PM doesn't work. HVI tracks running hours and schedules PM at 250hr, 500hr, 1000hr intervals automatically.
Managing equipment across multiple highway packages, metro contracts, and bridge projects? HVI shows you which equipment is where, its status, and maintenance needs — all in real-time.
See your entire infrastructure fleet in one dashboard. Which equipment is running, which is down for maintenance, which needs service. Make informed deployment decisions.
HVI supports all equipment used in Indian infrastructure projects. Equipment-specific inspection checklists for each machine type — from sensor pavers to tower cranes.
These are not projections. These are actual results from Indian infra contractors using HVI to manage equipment across highway, metro, bridge, and expressway projects.
With hour-based PM and daily inspections, unexpected breakdowns reduce by 40% in first 6 months.
Average equipment availability across HVI customers. Up from 75-80% before HVI. Less idle time.
Average savings from reduced breakdowns, avoided project delays, and extended equipment life.
All inspection records, service history, and calibration certificates available instantly for NHAI/client audits.
Yes. HVI mobile app works completely offline. Operators can complete inspections even at remote sites with zero network. Data syncs automatically when they return to network coverage area. Tested on highway projects across Rajasthan, MP, and Northeast where connectivity is extremely limited.
Yes. HVI is built for multi-project operations. Assign equipment to projects, track utilization and costs per project, transfer equipment between sites with complete history. See all your projects and equipment from one dashboard. Perfect for contractors managing multiple highway packages simultaneously.
Every daily inspection requires hour meter reading entry with photo. HVI automatically calculates hours run and PM due dates. When equipment transfers to another project, complete history follows. New project continues from where old one left off. No manual tracking needed.
Yes. We have pre-built checklists for all concrete equipment — sensor pavers (hydraulics, screed, sensors), batching plants (weigh system, moisture sensors, conveyors), transit mixers (drum, hydraulics, discharge), concrete pumps (boom, valves, pipeline). Fully customizable to your requirements.
Yes. Add hired equipment with vendor name, rental period, and rental rate. Track inspections and usage separately. Generate reports showing own vs hired equipment utilization. When rental ends, archive the equipment. Perfect for project-based hiring.
Most projects go live in 1-2 days. Add equipment via Excel upload, configure project sites, add operators and supervisors — done. Our team provides on-site training if needed. Operators learn the app in 30 minutes. Many contractors start with one project and expand to others.
"Our paver was running 12 hours daily. Missed one PM, hydraulic pump seized. ₹18 lakh loss. With HVI, we haven't missed a single service in 14 months. Zero major breakdowns during concrete pour."
Rajesh Patel
Project Manager, Highway Contractor
"Managing 45 transit mixers across 3 batching plants was impossible. Now I see which mixer is where, which needs service, which is idle. Fleet utilization improved from 72% to 89%."
Amit Sharma
Fleet Head, Ready-Mix Company
"NHAI quality audit used to be stressful. Equipment calibration records everywhere. Now everything is in HVI — inspection logs, PM records, certificates. Audit completed in 2 hours instead of 2 days."
Sunil Kumar
QA Manager, Construction Company
"Equipment transfers between metro packages were chaotic. No records of condition at transfer. Now every transfer is documented with photos and inspection report. Disputes reduced to zero."
Priya Singh
Equipment Manager, Metro Contractor
Join 250+ Indian infrastructure contractors using HVI to reduce breakdowns, avoid project delays, meet milestones, and manage equipment across multiple sites. Go live in 1-2 days.