For Infrastructure Project Logistics Teams

Keep Your Project Site Logistics Moving. Zero Material Delivery Delays.

Digital inspection reports, kilometre-based preventive maintenance, and project compliance tracking for the logistics fleet that runs your highway, metro, mining, and EPC project sites — tippers moving aggregates, bulkers hauling cement, fuel bowsers serving equipment, and material transport trucks feeding your BOQ schedule.

No credit card required Go live in 1 day Works offline at remote project sites

45K+

Site Inspections Completed Across infra project fleets

1,800+

Project Vehicles Managed Tippers, bulkers, bowsers

120+

Active Project Sites Highway, metro, mining, EPC

-28%

Site Delivery Delays With preventive maintenance

Project Logistics Challenges

Sound Familiar? Every EPC & Infrastructure Company Faces These Problems.

Running a highway package or metro phase means managing dozens of tippers, bulkers, and bowsers shuttling between quarry, batching plant, and the active work front. Paper logs get lost in site offices. Breakdowns stop your BOQ schedule. Client audits catch missing records. HVI solves all of this.

Tipper Breakdown Stops the Work Front

Tipper breaks down mid-route between quarry and batching plant. Aggregate supply stops. Paver idle on the work front. ₹3-4 lakh penalty per day for BOQ slippage. A 10-minute inspection would have caught the brake issue.

Client & NHAI Audit Panic

NHAI/MoRTH audit team visits the Package 3 site office. They ask for the last 6 months of vehicle inspection records. Paper files scattered across 4 project sites. Supervisors scrambling for 3 days to compile paperwork.

Fuel Bowser Service Missed

Fuel bowser was due for pump service at 15,000 km. Crossed 22,000 km. Pump failure on site. 8 excavators and 5 pavers without fuel for half a day. Production loss far higher than the ₹18,000 service that was missed.

No Visibility Across Project Packages

Your company is executing NH-48 Pkg 3, Dwarka Expressway Sec 21, and Metro Phase 2 simultaneously. Each site has its own logistics fleet. Head office in Gurgaon has no real-time view of which vehicle is where, what is broken, what is pending service.

Site Safety & Driver DVIR Gaps

Tipper drivers skip pre-shift inspections on busy mornings. Paper DVIR books filled in bulk at week-end. One tipper rollover on the haul road — insurance claim rejected because there is no real inspection trail. EHS officer under client scrutiny.

No Project-Wise Cost Analysis

Which project is eating your logistics budget? Which vehicle is costing 2x average per km? Which hired tippers should not be renewed next month? No data. Just monthly workshop bills hitting the project P&L with no breakdown.

These problems cost Indian EPC companies ₹4-8 crore per project in BOQ slippage, LD penalties, and emergency repairs.
See How HVI Solves This

How HVI Solves It

From Paper Chaos to Digital Project Control — In 4 Simple Steps

HVI digitises your entire project logistics fleet management. Driver DVIRs, preventive maintenance, site compliance, and project-wise reports — all from one mobile app that works offline at remote project sites where network drops regularly.

01
Driver Pre-Shift DVIR

Tipper & bulker drivers complete digital pre-shift inspection with photos. GPS-stamped from the project site. Defects alert the site engineer and workshop in-charge instantly.

02
Preventive Maintenance

Set PM schedules by kilometres or running hours. HVI reminds the workshop before service is due. Never miss engine oil, tyre rotation, or tipper hydraulic service again.

03
Site Workshop Work Orders

Track all repairs at the site workshop. Assign mechanics, track parts issued from site stores, record costs per project. Complete service history per vehicle, per package.

04
Project-Wise Reports

Real-time dashboards. Vehicle uptime per project, cost per km, compliance scores per package. Export to Excel for NHAI/client audits and internal project reviews.

Paper Site Registers
Driver Mobile App
Project Dashboard
Real-Time Reports
Full Client Compliance

Key Features for Project Logistics Teams

Built Specifically for Indian EPC & Infrastructure Fleet Operations

Not a generic fleet tool. HVI is built for Indian EPC companies, highway contractors, metro builders, and mining operators — with features that solve the real problems of project site logistics fleets that move material, fuel, and equipment across work fronts.

HVI — Pre-Shift DVIR
Tipper TP-18 | NH-48 Pkg 3
Tyres & Wheels Pass
Tread: OK Pressure: 90 PSI No cuts
Hoist Hydraulics & Body Note
Pins & bushes OK Minor oil seepage
Brakes & Safety Pass
Parking brake, service brake, horn, reverse alarm all working
4 photos attached
Submitted
Driver DVIR

Digital Pre-Shift Inspection — For Every Tipper, Bulker & Bowser

No more fake paper DVIRs filled at week-end. HVI provides vehicle-specific digital checklists for tippers, bulkers, fuel bowsers, and material trucks — with photo capture, GPS stamping from the project site, and instant defect alerts to the site engineer.

  • Pre-shift & end-of-shift DVIR with photos
  • GPS-stamped from the project site — proves real inspection
  • Defects alert site engineer & workshop in-charge
  • Works offline on haul roads with no mobile network
Try Free for 14 Days
HVI — Project Fleet PM Schedule
This Week
Overdue (3)
Tipper TP-07 — Engine Oil Change Dwarka Expressway, Sec 21 | Overdue by 2,800 km
Critical
Cement Bulker CB-02 — Compressor Service NH-48 Pkg 3 | Overdue 10 days
Critical
Due This Week (5)
Fuel Bowser FB-04 — Pump Service Metro Ph-2 Depot | Due in 300 km
Soon
Lowbed LB-01 — Brake Chamber Check Coastal Road Site | Due in 3 days
Soon
24 scheduled this week 16 completed
Preventive Maintenance

Never Miss a Service. Never Stop the Work Front.

Set PM schedules by kilometres or running hours. HVI sends automatic reminders to the site workshop team. Track engine oil changes, tipper hydraulic service, bulker compressor overhaul, bowser pump service — all from one dashboard.

  • Km-based PM: Engine oil, tyres, brakes, clutch
  • Hour-based PM: Tipper hoist, bulker compressor, crane boom
  • Auto reminders 500 km / 7 days before due date
  • Escalation if service overdue — project manager alerted
See PM Demo
HVI — Compliance Tracker
97% Compliant
Document Validity Status
RC Book — Tipper TP-18 Valid till Aug 2028
Valid
Project Insurance — NH-48 Fleet Valid till Jan 2027 | All 42 vehicles
Valid
Fitness Certificate — Bulker CB-05 Dwarka Expressway fleet | Expires in 28 days
Renew Soon
PUC Certificate — Bowser FB-02 Metro Ph-2 | Expired 5 days ago
Overdue
7 renewals due next 30 days View All
RTO & Client Compliance

Track Every Document. Pass Every Client & NHAI Audit.

RC book, insurance, fitness certificate, PUC, permit, road tax, driver licence — track all vehicle documents per project. Get alerts 30 days before expiry. No more RTO fines on the haul road. No more client audit panic at the project office.

  • Fitness certificate renewal alerts — 30 days advance
  • Insurance & PUC expiry tracking per vehicle
  • Project-wise compliance reports for client audits
  • One-click MoRTH/NHAI format export
Start Free Trial
HVI — Multi-Project Fleet Dashboard
5 Projects
NH-48 Highway, Pkg 3
42 vehicles
36 On Route 4 Site Workshop 2 Breakdown
Dwarka Expressway, Sec 21
28 vehicles
26 On Route 2 Site Workshop
Metro Phase-2 Depot
18 vehicles
17 On Route 1 Site Workshop
Coastal Road Project
22 vehicles
20 On Route 2 Site Workshop
Multi-Project Visibility

See Every Project Fleet — From One Dashboard

Executing highway packages, metro phases, and mining contracts simultaneously? HVI gives head office one dashboard to see every project — which tippers are on route, which bulkers are in workshop, which bowsers are broken down, in real-time across all sites.

  • Project-wise fleet status — on route, workshop, breakdown
  • Compare cost per km & compliance across projects
  • Site engineers see only their project
  • Head office sees the full project portfolio at a glance
See Multi-Project Demo

Project Logistics Vehicle Types

Built for All Vehicles on Your Infrastructure Project Site

HVI supports every type of logistics vehicle used on Indian infrastructure projects. Vehicle-specific inspection checklists for project-site operations. Add any vehicle — we have templates ready.

Tippers & Dumpers
Aggregate, muck, soil hauling
Cement Bulkers
Cement, flyash, PPC hauling
Fuel Bowsers
HSD supply to site equipment
Lowbeds & Trailers
Excavator, crane, dozer transport
Steel & Rebar Trucks
TMT bars, structural steel
Water Tankers
Curing, dust suppression
Material Trucks
Pipes, shuttering, miscellaneous
Boom Pumps
Concrete pumping trucks
LCVs & Pickups
Tools, spares, site supplies
Staff Buses
Labour colony to site transport
Site Staff Cars
Engineer & supervisor vehicles
Ambulance & Service
Site emergency & service vans
Running a hired tipper fleet or owned mixed fleet? HVI handles both — with separate tracking for owned vs hired vehicles on every project.
Talk to Us

Real Results

What Infrastructure Companies Achieve with HVI

These are not projections. These are actual results from Indian EPC and infrastructure companies using HVI to manage their project site logistics fleets across highway, metro, and mining projects.

28%

Less Site Delivery Delays

Fewer tipper & bulker breakdowns means aggregate & cement reach the work front on time. Project BOQ progress protected.

97%

Audit Compliance

Average compliance rate across HVI customers. Up from 70% before HVI. NHAI & client audits now pass without panic.

₹1.2Cr+

Saved Per Project

Average savings per large highway package from reduced LD penalties, fewer breakdowns, and extended vehicle life.

22%

Higher Vehicle Uptime

More tippers on the haul road, fewer in the site workshop. Direct impact on daily haulage tonnage and BOQ progress.

Case Study — Mid-Size EPC Contractor
Highway Package
The Challenge

A mid-size EPC contractor was executing an NH-48 package with 42 tippers, 6 bulkers, and 4 fuel bowsers moving material between the quarry, batching plant, and 18 km work front. Paper DVIRs were fake. 8-10 tipper breakdowns per month caused paver idle time. BOQ slipping by 6 days per month.

The Solution

Deployed HVI across the project fleet in 4 days. Digital driver DVIRs mandatory before every shift. Km-based PM schedule for every tipper. Hour-based PM for bulker compressors and bowser pumps. Site workshop integrated with the central plant & machinery team.

The Results (After 9 Months)
Breakdowns
9/mo
3/mo
BOQ Slippage
6d/mo
0-1d
Fleet Uptime
76%
93%
Repair Cost
₹58L
₹34L
Key Improvements
  • Zero LD penalties in last 7 months of execution
  • NHAI audit cleared with zero observations on P&M records
  • All 52 project vehicles on daily digital DVIR before every shift

Frequently Asked Questions

Questions EPC & Project Logistics Teams Ask About HVI

Yes. HVI mobile app works completely offline. Drivers and site engineers can complete pre-shift DVIRs, record fuel issue slips, and log breakdowns — all without internet. Data syncs automatically when connection is restored. Tested at remote highway packages in Rajasthan, mining sites in Jharkhand, and metro depots on city outskirts where mobile network drops regularly.

Yes. Tag every vehicle as owned or hired in HVI. Hired tippers can have their own hire agreement validity, per-trip rate, and monthly run hours tracked separately from your owned fleet. Get separate reports for owned vs hired fleet cost per project — essential for deciding which hired vehicles to retain or release each month.

Yes — and this is critical for project fleets. A tipper needs km-based PM for engine oil but hour-based PM for hydraulic hoist. A cement bulker needs km-based PM for engine but hour-based for the compressor. HVI lets you set multiple PM schedules per vehicle on different meters — whichever comes first triggers the service reminder. Integrate with your GPS/telematics via API for automated meter updates.

Yes. Pre-built DVIR checklists for all project logistics vehicles — tippers (hoist, body, tailgate, tyres), cement bulkers (compressor, discharge pipes, aeration), fuel bowsers (pump, dispenser, grounding, fire extinguisher), lowbed trailers (goose neck, ramp, tie-down points), water tankers (valve, overflow, mounting brackets). All templates fully customisable to your project SOP and client specifications.

Most projects go live in 3-5 days. Add vehicles via Excel upload (RC details, odometer, project tag), configure DVIR checklists, add drivers and site mechanics, assign site engineers as supervisors — done. Our team handles setup at no extra cost. Drivers start using the app the same day after a 20-minute toolbox talk at the project site.

All reports export to Excel and PDF: Driver DVIR compliance per project, PM adherence by vehicle, project-wise vehicle uptime, cost per km per project, repair history per vehicle, RTO document status, breakdown incidents with root cause, owned vs hired fleet cost breakdown. Perfect for monthly project review meetings, client progress reviews, NHAI/MoRTH audits, and internal P&M reviews. One-click export saves days of manual compilation.

Trusted by Indian EPC & Infrastructure Companies

80+

EPC & Infra Companies

1,800+

Project Vehicles

45K+

Site DVIRs Completed

120+

Active Project Sites

"Our highway package had 42 tippers running between quarry and batching plant. Before HVI, 8-10 breakdowns a month, paver idle time, BOQ slipping. Now breakdowns are down to 3 per month and the work front never waits for aggregate."

Rajesh Kumar

Project Manager, Highway EPC Contractor

"Managing tippers, bulkers, and bowsers across 3 active packages was impossible on paper. Now I see every vehicle, every project, from my office in Gurgaon. NHAI audit cleared zero observations on P&M records last month."

Priya Sharma

Head of P&M, Mid-Size Infrastructure Company

"Drivers were filling paper DVIRs in bulk at week-end — totally fake. HVI forces a real digital check before every shift with GPS and photos. Accident rate on our haul road dropped 40% in first quarter. EHS team actually has data now."

Vikram Singh

EHS Manager, Mining Contractor

"Cost per km per project — that one report changed everything. We found 6 hired tippers costing 3x the fleet average. Released them next month, saved ₹18 lakh on that package alone. HVI pays for itself in the first month."

Amit Patel

Commercial Head, EPC Contractor

Get Started Today

Ready to Digitise Your Project Site Logistics Fleet?

Join 80+ Indian EPC and infrastructure companies using HVI to keep their project site logistics running, protect BOQ progress, and pass every client audit. Start free trial today — no credit card required. Go live on your next project in 1 day.

No credit card required Free project setup assistance Works offline at remote sites
HVI — What You Get
All Included
Driver DVIRs Pre-shift & end-of-shift
Preventive Maintenance Km & hour-based
Site Workshop Orders Track all repairs
Parts Inventory Site stores integration
RTO & Compliance Fitness, insurance, PUC
Project-Wise Reports Cost per km, uptime
Owned vs Hired Tracking Separate fleet reports
Mobile App Works fully offline
Free Project Setup + Driver Training Our team helps you go live — no extra cost