A mobile crane pre-lift check is not really a list, it is a sequence of gates. Each one has to be satisfied before the next matters, and a failure at any of them means the hook does not move regardless of how the rest of the machine looks. Ground conditions being wrong makes a perfect boom irrelevant. An outrigger not fully deployed makes the load chart meaningless. Treating these as items to tick in any order is how a crew ends up rigged and ready before anyone checks whether the configuration was ever within capacity. Running them as gates takes no longer and fails safely, and you can see the digital version in a free 30-minute demo.

Mobile Crane Pre-Lift Checklist — Run It as Gates, Not a List

Boom, outriggers, wire rope, hook and shackle, load chart, and operator authorisation, sequenced so a failure stops the lift at the point it is found rather than after the crew has rigged.

Five Gates Before the Hook Moves

Gate 1 — Ground and Position
Ground bearing capacity assessed for the configured load and radius.
No excavations, voids, buried services, or recent backfill within the footprint.
Crane level within the manufacturer's tolerance, confirmed on the indicator.
Clearance from overhead power lines and structures verified.
Stop condition: any doubt about ground support. Nothing below this gate compensates for it.
Gate 2 — Outriggers and Stability
Outriggers extended to the position the lift was planned for, not a partial setting.
Pads correctly sized, seated flat, and in full contact with the mats.
Tyres clear of the ground where full deployment requires it.
No hydraulic drift observed at the outrigger cylinders.
Stop condition: partial deployment. The load chart no longer applies to the setup.
Gate 3 — Boom and Structure
Boom sections checked for dents, cracks, corrosion, or weld damage.
Telescoping operation smooth through its range, with no binding or unusual noise.
Sheaves turning freely with guards and rope keepers intact.
Boom angle indicator and length indicator reading accurately.
Anti-two-block device tested and functional.
Stop condition: structural damage or a failed limiting device.
Gate 4 — Rope, Hook and Rigging
Wire rope inspected along accessible length for broken wires, kinks, birdcaging, and corrosion.
Rope assessed against discard criteria, not simply looked at.
Hook checked for deformation, throat opening, cracks, and free rotation.
Safety latch present and closing fully under its own spring.
Slings and shackles within their inspection date and correctly rated.
Stop condition: rope at discard criteria, hook deformation, or missing latch.
Gate 5 — Load and Authorisation
Load weight confirmed rather than estimated, including rigging weight.
Radius measured for the actual pick and set-down positions.
Configuration checked against the correct load chart column for that setup.
Load moment indicator functional and set to the current configuration.
Operator authorised for this crane class, and signaller identified.
Stop condition: unverified load weight, or capacity exceeded at the working radius.

The Checks Nobody Can See You Skip

Gates one to four leave physical evidence when they are done. Gate five does not, which is why it is the one most often assumed rather than performed.

Load weight

An estimate from a drawing or a supplier is not a confirmation, and rigging weight is frequently left out of it entirely.

Working radius

Measured at both pick and set-down, since capacity falls away sharply as radius increases.

Chart column

The right chart for the actual counterweight, outrigger position, and boom configuration in use today.

Authorisation

Current authorisation for this crane class, recorded rather than assumed from familiarity.

Run This as a Digital Gate Sequence

Each gate completed on a phone, with a critical failure raising a work order and notifying the site engineer immediately.

What a Critical Fail Sets Off

Marked fail with photo evidence attached at the gate where it was found.

Work order generated automatically and routed to the responsible supervisor.

Crane held until the item is closed and re-checked, not merely noted.

Parts, labour, and downtime logged against that crane's own history.

Frequently Asked Questions

Why sequence the checks rather than let the operator work through them freely?

Because the later checks depend on the earlier ones being true. A load chart calculation is only valid for the outrigger configuration actually deployed, so confirming stability first prevents a valid-looking calculation for a setup that does not exist. You can see the sequence on a demo call.

Does this replace a thorough examination or load test?

No. This is the pre-use check before a lift. Statutory examinations, load tests, and rope inspections run on their own intervals and are recorded separately against the crane.

How long does the full sequence take an operator?

A few minutes when items are grouped in the order the operator moves around and through the setup, with pass cleared by a single tap and detail captured by photo or voice note.

Can it be completed without signal on remote sites?

Yes. The whole sequence completes offline and syncs when the device reaches coverage, preserving the original completion time.

Does the checklist library cover other equipment?

Yes, including excavators, dump trucks, tippers, DG sets, and other plant machinery. Start with a free trial to load your own equipment.

Fail the Lift at the Gate, Not Under Load

Run ground, outriggers, boom, rope and rigging, and load verification as a sequence where each gate has to hold before the next one counts, with critical failures raising a work order and holding the crane until they are closed.